<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>apiengineering</title>
    <link>http://www.apiengineering.com.au</link>
    <description />
    <atom:link href="http://www.apiengineering.com.au/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>Design, Program &amp; Commissioning</title>
      <link>http://www.apiengineering.com.au/design-program-and-commissioning</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Design, Program &amp;amp; Commissioning
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Gosford Hospital—EPG Control System Design, Program &amp;amp; Commission
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Gosford Hospital EPG Upgrade
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: Kenshaw Electrical
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: Design a new generator control system with the DSE 8660 &amp;amp; 8610 to seamlessly integrate with the Cummins PCC3.3 generator controller. The system was to have loading and dynamic load-shedding capabilities. The system had to be able to operate in multiple scenarios: one generator, two generators, mains failure during testing and a temporary generator.
           &#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           John Hunter Hospital Program—Commission New Cummins EPG Installation
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: John Hunter Hospital EPG Upgrade
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: Kenshaw Electrical
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: Calibrate and program the newly installed Cummins generators with PCC 3.3
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           controllers. Synchronise the generators, set up HLI interface and commission as per hospital requirements.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Koramba Cotton Gin—Program, Integrate &amp;amp; Commission New PCC3.3 to 3100 system
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Koramba Power Station Repower
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: Cummins South Pacific
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: Newly installed Cummins C1100D5 generator was installed to an existing fully integrated system. The new C1100D5 control system was a PCC3.3. The existing system was a PCC3100 with remote load sharing via a Toshiba PLC. First start arbitration had to be mitigated. Load sharing had to be set up and programmed. This was one of the first QST30-powered 3100 to 3.3 integrations in Australia.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/2022-09-07_10h22_58+%281%29.jpg" length="64230" type="image/jpeg" />
      <pubDate>Wed, 07 Sep 2022 05:56:48 GMT</pubDate>
      <guid>http://www.apiengineering.com.au/design-program-and-commissioning</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/2022-09-07_10h22_58+%281%29.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/2022-09-07_10h22_58+%281%29.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Generator Installations</title>
      <link>http://www.apiengineering.com.au/generator-installations</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Generator Installations
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Sanitarium—100Kva Generator Installation
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Sanitarium Backup Generator Installation
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: Cummins South Pacific
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: The installation of a C110D5 (110 Kva) generator for the backup of Sanitarium’s UPSes at their new Warnervale facility.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Stroud Community Lodge—66Kva Generator Installation
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Backup Generator Installation
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: Stroud Community Lodge
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: The installation of a C66D5 (66Kva) generator for the back of the entire community lodge located in Stroud, NSW.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Angel Sussuri—66Kva Generator Installation
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Backup Generator Installation
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: Angel Sussuri – Yarramalong Manor
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: The installation of a C66D5 (66Kva) generator for the back of the Yarramalong Manor café and restaurant located in the Yarramalong Valley, Central Coast
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/IMG_20180726_065853.jpg" length="57806" type="image/jpeg" />
      <pubDate>Wed, 07 Sep 2022 05:56:45 GMT</pubDate>
      <guid>http://www.apiengineering.com.au/generator-installations</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/IMG_20180726_065853.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/IMG_20180726_065853.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Control System Replacements</title>
      <link>http://www.apiengineering.com.au/control-system-replacements</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Control System Replacements
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           TAB Corp—Heisman to DSE Upgrade
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Control System Upgrade
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: TAB Corp
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: Replacement of the current Heisman control system with a new DSE control system. New Woodward PISC (proportional integrated speed controllers) were installed for speed control. The DSE controller used was a DSE 8920 with a 7” graphical display.
           &#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           St Vincent Hospital—PLC &amp;amp; Generator Control Upgrade
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Control System Upgrade
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: St Vincent Hospital
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: Replacement of the Current ATS PLC system, design, program and installation.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Replacement of the current generator controller to a controller with higher protection and HLI Features. The ATS PLC was replaced from a Modicon Twido PLC to a Schnider M221 PLC. The generator controller was replaced from a legacy Woodward 1000 to a Woodward Easygen 0800.
           &#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Central Coast Council—Replacement of Kohler DEC1000 to Woodward EG0800
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Control System Upgrade
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: Central Coast Council
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: Current Kohler DEC1000 controller had an intermittent display fault. The customer wanted the system replaced with a system that had higher HLI features. A new Woodward Easy Gen 0800 was installed with an expansion IDK. Additionally, a flowline DL14 was installed with a Red Lion seven-segment display.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/2022-09-07_11h07_31.jpg" length="31648" type="image/jpeg" />
      <pubDate>Wed, 07 Sep 2022 05:56:45 GMT</pubDate>
      <guid>http://www.apiengineering.com.au/control-system-replacements</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/2022-09-07_11h07_31.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/2022-09-07_11h07_31.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Automation, Comms &amp; Control Integration</title>
      <link>http://www.apiengineering.com.au/automation-comms-and-control-integration</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Automation, Comms &amp;amp; Control Integration
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            From Pack Australia—Pallet Wrapper Siemens Integration Project
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Fromm Automated Pallet Wrapper Program Integration
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: Fromm Pack Australia
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: Fromm Pack imported a new high-speed double-tier pallet wrapper. The existing
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           programming was written to work with a European-sized pallet. The program was amended and tested to ensure Australian pallets could now be wrapped and sealed without damaging the goods.
           &#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/2022-09-07_10h45_44.jpg" length="46528" type="image/jpeg" />
      <pubDate>Wed, 07 Sep 2022 05:56:43 GMT</pubDate>
      <guid>http://www.apiengineering.com.au/automation-comms-and-control-integration</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/2022-09-07_10h45_44.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/2022-09-07_10h45_44.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Overseas Projects</title>
      <link>http://www.apiengineering.com.au/overseas-projects</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Overseas Projects
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Nanuya Island Resort Fiji—Generator Repower &amp;amp; SMA System Reprogram
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: Nanuya Island Repower
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: Nanuya Island Resort Fiji
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: Nanuya Island Resort had been reporting power issues on their site. Their primary
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           generator was replaced with a Cummins C170D5. The site has a 96Kw SMA Sunny Island system with 115Kw of solar. The Island system was behaving erratically and power dropouts were constant. After reprograming the system and recalibrating the controllers, the system operated again with full autonomy.
           &#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Intercontinental Resort Fiji—DSE5510 8610 Replacement &amp;amp; HV Audit
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Project: DSE 5510-8610 Control System Replacement &amp;amp; Integration
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Customer: IHG Group
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Scope: IHG Intercontinental resort had two failed DSE 5110 controllers. The site had recently had the alternators rewound and needed them installed and commissioned as part of this project. The DSE 5510 was removed and the new DSE8610 were installed. While onsite, API carried out a HV system audit and updated their HV single-line diagrams
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/IMG_20180823_101635.jpg" length="80286" type="image/jpeg" />
      <pubDate>Wed, 07 Sep 2022 05:56:36 GMT</pubDate>
      <guid>http://www.apiengineering.com.au/overseas-projects</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/IMG_20180823_101635.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/184b20e7/dms3rep/multi/IMG_20180823_101635.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
